Details: Support-bases

#

Clamped support

General:

All base steel parts are zinc coated and preassembled at the factory.

Clamped support (eave)

The steel part (IPE-profile) is shed on site in the concrete foundation.

On the left an axis with the connection of a round steel diagonal by wall bracing is shown.

#

Pendulum support

Pendulum support (eaves)

The steel part (IPE profile with base plate) is dowelled with heavy duty anchors to the foundation on site.

On the left an axis with the connection of a round steel diagonal by wall bracing is shown.

Note

The exact design of steel parts will be matched on-site in the course of works with the foundation or the base plate.